BCA Part J compliance reports for all types of new developments, extensions and refurbishments (class 2-9). We provide a fast 2 day turnaround on most jobs, and service clients all over Australia. Our comprehensive BCA Section J Reports are presented in an easy to follow format and have the highest success rate in meeting building permit requirements.
• Detailed assessment of the building plans to ensure compliance with BCA Part J
• A professional and detailed Part J energy compliance report - as required to obtain a Building Permit / Construction Certificate (CC)
• Straightforward recommendations, if neccessary, to achieve BCA Part J compliance
• Fast turnaround and outstanding service
• Some of the most competetive rates around, and no hidden charges!
• Executive Summary
• Introduction
• Part J-1 Building Fabric
• Part J-2 External Glazing
• Part J-3 Building Sealing
• Part J-4 Air Movement
• Part J-5 Air-Conditioning and Ventilation Systems
• Part J-6 Artificial Lighting and Power
• Part J-7 Hot Water Supply
• Part J-8 Access For Maintenance
• Working drawings: Floor & roof plans, elevations, sections, details, site plan, electrical & HVAC plan
• Window & Door sizes
• Specifications: Insulation, glazing, lighting, air-conditioning & ventilation systems
Depending on the size and complexity of the project, turnaround generally ranges from 1-4 days. We provide an accurate time frame and completion date at the time of quoting.
Offices, retail, wholesale, car parks, public and aged care buildings, warehouses, storage, industrial and production facilities.
Apartment buildings, hostels and boarding houses and Class 4 dwellings within a commercial building.
Class 2 apartment buildings require a Part J report for the shared or public areas, as well as a 6-Star House Energy Rating (HER) for each individual dwelling.